Processing plant supervision

Terragold has been awarded a processing plant construction supervision contract by TEKO MINING quarries Strazevica – Batocina and Teko Mining Ceramide.
Teko Mining, Serbia’s largest aggregates producer has selected Metso to provide crushing and screening equipment for two of their quarries in Serbia. The new solutions will significantly increase production capacity, reduce waste, and improve end-product quality.
Teko Mining has four quarries almost fully equipped with Metso solutions. With a production capacity of about three million tons per year, these quarries produce various stone materials for the development and construction of infrastructure in Serbia. After the commissioning of the new Metso crushing and screening equipment, the Strazevica quarry plant capacity, with final products ranging from 0-4 to 32-63 mm, will increase to around 300 metric tons per hour.
The new Metso crushing and screening plant being delivered to Teko Mining’s Straževica quarry consists of a Premier CVB202P(TM) inclined screen, an NW1213(TM) portable impact crusher, and 2 NW2060(TM) portable screening plants. In addition, the delivery included a Barmac B6150SE on skids, dedusting equipment, steel structures, and conveyors.
Teko’s Ceramide operations will be upgraded with two new Premier CVB(TM) screens.

Recent Posts

Leave a Comment